Home > Error For > Error For Com Routine Using Application Program Return Code 40.152

Error For Com Routine Using Application Program Return Code 40.152

Contents

I have a similar issue.   Thanks and Regards, Neha 0 0 12/02/13--15:30: SBO-COMMON no esta actualizado. And therefore by using SAP EHS you will find a solution. click on New Combination 6. I have cleaned up the code and resolved many of the issues. get redirected here

Probably, the custom logic might be in place to prevent stock posting if the status is CTCM, Need to check from this aspect also.   Anand 0 0 11/27/13--10:30: Re: GeoMap It is an LIS report based on S039 table. For the transaction data just add the logsys in each transformation with the hardcoded sourcesystem value to seperate data. role is included in composite role (and included in transport, otherwise composite role won't work) and that transport is imported to upgraded system, will it overwrite the existing Std. http://scn.sap.com/thread/3462444

Error For Com Routine Using Application Program Return Code 40.152

I checked the same role in a different system and when I compared the authorization objects, it did not have the same authorization objects.. I'm using control key PP01 in my routing. ENDMETHOD. 0 0 12/01/13--11:58: Re: Forecast is not Generating only for Particular SKUs in a Depot...!!.... We are not able to see SNP: Preq in ECC.

The logic field in bookmarks could be renamed, if this is easier than changing to showing the real content owner. This report will give the stock of materials on a particular date or range of date. Most common one is missing SID link between Master data (infoobject table) and DIM ID of the infocube. yes no add cancel older | 1 | .... | 25 | 26 | 27 | (Page 28) | 29 | 30 | 31 | .... | 425 | newer HOME

Docking properties etc....   what i like in OO ALV is   In OO ALV, you don't need to worry about the application toolbar designing and adding some functions we will etc   thanks SaiKrishna 0 0 12/01/13--11:03: Re: Error for COM routine using application program (return code 40.152) Contact us about this article in some situations, after making the profile selection movement types. this page As mentioned. "Easy Expert" can only deal with very  simple rules and very simple data constellations.   C.B. 0 0 12/01/13--11:40: Re: Editing the standard WD component Contact us about this

Contact us about this article Buenas, estoy instalando el servidor de SAP B1 9.0 en otra pc y las bases de datos las estoy moviendo con un atach y tambien el System usually picks the first GUID only when loading the data to data view. System usually picks the first GUID only when loading the data to data view. Developing SAP RFC's for interaction for data 3.

Can you please give your valuable inputs how to do that ?   Thanks and regards Krishna mohan 09176279378 0 0 12/01/13--11:55: Re: Badi implementation ME_PROCESS_PO_CUST Contact us about this article http://unanswered244.rssing.com/chan-13302099/all_p20.html Thank u in advance. Error For Com Routine Using Application Program Return Code 40.152 Created a route (Loc A --- Loc B --- Loc C --- Loc D) using Route type in NWBC < Master Data < Transportation Network < Default Route < Create Default Tlanes (with subcontracting flag checked )are created for components from  subcontracting plant-> vendor.   when i run multilevel heuristics dependent demand for the components are not getting created in vendor location

setup vendor location and create PPM in vendor location(resources from subcontracting plant are referred) 2. http://invictanetworks.net/error-for/error-for-com-routine-using-application-program-return-code-3.html I was just checking in exceptions cases do we have any way to change it or not. The Value column contains a combination of a business transaction and catalog category, based on the settings from the Customizing activity Assign Transaction Types to Catalog Categories.   After configuration make Right now iam using the BAPI - BAPI_PBSRVAPS_GETDETAIL2 but it is taking too long if i run the report wide open for a planning book and date range for a keyfigure.

  • I know that an ERP 6.0 should be possible.
  • Kindly refer the Installation and configuration links http://scn.sap.com/docs/DOC-43539   But is it possible to connect an ECC 6.0 SAP System (Basis 700) with the Enterprise Search ?
  • I could find a number of implementations for numerical values but none for texts I am afraid.   Greetings Andreas 0 0 11/28/13--10:27: Create Delivery any time before requested delivery date.
  • There should not be any manual intervention.   Stage 1: Loc A ----> Loc B Stage 2: Loc B ----> Loc C Stage 3: Loc C ----> Loc D   Activities
  • Contact us about this article Hi Prashant,   There are two options available as per my opinion.   Provide the answer on the thread and mark it as Correct Answer.
  • Later, you go to QC55 to acknowledge the receipt of the same.   As long as lot is in CTCM you can't give UD, but you should be able to post

I need to build a custom report where on the selection screen i would have planning book name,data view name,version,from date, to date, item,location and key figure. Title Author Bookmarks of: (add new tag) Adult Image? Make the discussion as Assumed Answer.   Thanks, Suman$ 0 0 11/28/13--10:40: Error for COM routine using application program (return code 40.152) Contact us about this article   Hello, first time useful reference now I can create the delivery on 5th dec or after 5th dec only, but can not create the delivery before 5th Dec.   for one or two sales order user

Generating Files either to application/presentation server 5. yes no add cancel older | 1 | .... | 41 | 42 | 43 | (Page 44) | 45 | 46 | 47 | .... | 440 | newer HOME The use of BOMBOS can help; if indication of use of BOMBOS is based on questions coming up in this FORUM then it is used rarely.   C.B.   PS: the

I agree there are many issues.

I have been receiving an error message while working on the SDP transaction code (/SAPAPO/SDP94) for very specific cases and I could not figure out the cause.I created a Planning Book May be its a discontinued product. 0 0 12/02/13--15:29: Re: Change planning plant in production order Contact us about this article Hi Panos,   What was the workaround solution? Error while loading data in planning book psb_apo asked Dec 14, 2007 | Replies (1) hello All, In Interactive Demand Planning ( /SAPAPO/SDP94 ), when im trying to load data in In the SAP LES solution,  the shipment costs that are billed to the customer are based on the actual shipments costs that were calculated in the shipment cost document.   How

Any thoughts Activated FWO type for internal settlement Assigned diff Sales Org and Forwarding house  to dif company codes, assigned buisiness partners Created Internal Settlement agreement and assigned calculation sheet, with Make the discussion as Assumed Answer.   Thanks, Suman$ 0 0 11/28/13--10:40: Error for COM routine using application program (return code 40.152) Contact us about this article   Hello, first time Contact us about this article Hi,   Is there really nobody out there with this problem? http://invictanetworks.net/error-for/error-for-com-routine-using-application-program-return-code-2.html In case you need these values you can craete a Back Up cube of the Planning Area and store it.